Thanks everybody. I actually worked on the caah today. I cut the flanges out for the intercooler tubes to pass through the firewall. Ready to turn to size on the lathe.
15th Annual DRAGLIST Nationals Sometime in 2020. Somewhere in the USA.
Thanks Zap & Al. Got the flanges turned this weekend.
I put a groove around the edge of the flange for the firewall sheet metal. Once I install the o-ring and get in place I'll check the new gap with a feeler gauge and make a soft gasket to seal the flange to the firewall
Engine side of the flange bored to size for the tubes.
Got everything mocked up. The flanges on the windshield will be added to the inlet side. I'll turn those once I get the V-band clamp. Should be here any day. The outlet side attaches to the carb bonnet with hose & clamp.
15th Annual DRAGLIST Nationals Sometime in 2020. Somewhere in the USA.